What does industrial door installation include?
A complete installation runs from the site survey to commissioning: the door is only handed over once it works, its safety devices have been tested and your staff know how to use it.
- Preparation: removal of the old door if needed, check of the opening, lintel and bearings.
- Assembly: tracks, shaft, springs and panels for a sectional door; guides and housing for a high-speed door; axle and guide rails for a shutter.
- Automation: motor, control panel, controls and safety devices.
- Adjustment and tests: balancing, limit switches, timing, test of every safety device.
- Handover of documents: manual, manufacturer’s documents and maintenance logbook.
We fit industrial sectional doors, high-speed fabric doors, roller shutters and fire doors, all makes: models from the leading brands on the market, or a door made to measure to the dimensions taken by the technician. The fire doors we fit are certified products, supplied with their classification report.
How is an industrial door installed on a working site?
The job is planned with you so that the building is never left open unattended and traffic keeps moving where possible.
- 1Site surveyMeasurements, condition of the structure, power supply, access for lifting equipment, operating constraints.
- 2Agreed scheduleChoice of day and time slot: early morning, a quiet period or a planned shutdown of the loading bay.
- 3Cordoning off and removalThe work area is separated from forklifts and pedestrians; the old door is removed and taken away.
- 4Fitting and wiringTracks or guides fixed to the structure, door assembled, operator wired.
- 5CommissioningAdjustment, test cycles, safety checks, user training, logbook opened.
The time needed depends on the type and number of doors: it is estimated during the site survey, then specified on the quote.
What should be checked before fitting an industrial door?
Before any industrial door installation, check that the structure can carry the door and that the opening leaves room for the mechanism.
Headroom and side room
A sectional door needs space above the opening for the shaft and springs, side room for the vertical tracks, and space under the roof for its horizontal tracks.
Otherwise: a low-headroom or high-lift track, or another door type.The supporting structure
Concrete, masonry, steel frame or cladding: fixings are chosen to suit, sometimes with a reinforcing frame.
Otherwise: a steel frame is added around the opening.The power supply
A protected circuit must reach the control panel location, at the voltage the motor requires.
Otherwise: the circuit is included in the quote, run by us or coordinated with a partner tradesperson before fitting.Floor and traffic
A level threshold for the bottom seal, and the position of stops or forklift impact protection.
Plan for: protective bollards in front of exposed tracks.Which standards apply to an installed industrial door?
An industrial door must meet the product standard EN 13241 and carry the CE marking; if it is power-operated, its safety in use falls under EN 12453.
In a workplace, the French Labour Code (articles R4224-12 and R4224-13) and the order of 21 December 1993 then require automatic and semi-automatic doors to be maintained and inspected at least every six months, with a maintenance logbook. We open the logbook at commissioning, and follow-up can continue with our industrial door maintenance: we offer a maintenance contract covering these six-monthly inspections, with its content defined in the contract. A fire door is also installed in line with the conditions of its classification report: see fire doors.
Which door should you install for your building?
If no standard door suits your opening, made-to-measure industrial doors are the answer.
How much does industrial door installation cost?
The price depends on the door, the opening and any associated work: it is set out in a written quote after the site survey.
Site survey free, itemised quote before anything is ordered. Removal, disposal of the old door, fitting, automation and commissioning are listed line by line.
- The type and size of the door.
- Removal of the existing door and the condition of the opening.
- Lifting equipment needed for a tall door.
- The operator and safety devices chosen.
- Timing constraints if the work must be done outside operating hours.
Where do we install industrial doors?
Throughout Normandy, from the logistics platforms of Le Havre and the Seine valley to the business parks of Rouen, Caen, Évreux and Cherbourg. On the coast, salt air calls for corrosion-resistant fixings and hardware: this is checked during the site survey. After fitting, you keep the same contact: if the door breaks down, call us for an industrial door repair. All our solutions are on the industrial doors page.